Monthly Archives: November 2020

Layout Construction – Begins with 16 Feet of Mushroom

Last post, I described the design of the mushroom.  With the design complete, Chris and Phil pushed me to keep moving forward.  Chris came down on Wednesday (day before Thanksgiving) and both game on Saturday after Thanksgiving (for 8 hours).  … Continue reading

Posted in Current Layout, Layout Construction | 3 Comments

Layout Construction – Mushroom Design

For years, I’ve been procrastinating on the build of my Dream Sn2 SR&RL layout. I’ve been in this house for 13 years….So I’d say I’ve been stalling for more this 8 years. Even as recent as last month I was … Continue reading

Posted in Current Layout, Layout Construction, Layout Design | 2 Comments