Category Archives: Layouts

Track plan completed

Till now, I’ve been working with concept diagrams of the layout. The concepts were good to work out grades and get an idea of what would fit into the room. However, they were not sufficient to describe the railroad to … Continue reading

Posted in Current Layout, Drawings and Plans, Layout Design, Layouts | 3 Comments

Starting homasote spline roadbed (rather than foam board)

Last week I started putting in the “brackets” and roadbed under the new roadbed.  This supports from Madrid to Perham Junction and back up the Barnjam branch.  I will not go into the details of the design.  That is for … Continue reading

Posted in Comentary, Current Layout, Layout Construction | 1 Comment

Phillips planning

I started putting up backdrop last week with the goal to complete the upper level backdrop around the room by the end of this weekend.   Before the backdrop can go up, I needed locate a few key elements which required … Continue reading

Posted in Current Layout, Layout Construction, Layout Design, Phillips | 3 Comments

Sn2 layout traveled to shows

A look back…  The original Sn2 layout traveled to Gary Kohler’s 2-Foot meet, later the Midwest 2-foot show.  The original layout sections were built form 4″ of foam board, laminated with plywood and Masonite.  Gary Kohler provided the photos, he … Continue reading

Posted in Layout #1 - Portable, Layouts | 1 Comment

Farmington on the Floor

I’m not one that pursues a precise trackplan. Instead I pursue a benchwork/deck footprint and then try to confirm that most of what I want will fit. The final track locations get laid out on the finished benchwork/foam. The week … Continue reading

Posted in Current Layout, Farmington, Trackplanning | 5 Comments

Layout Construction – Begins with 16 Feet of Mushroom

Last post, I described the design of the mushroom.  With the design complete, Chris and Phil pushed me to keep moving forward.  Chris came down on Wednesday (day before Thanksgiving) and both game on Saturday after Thanksgiving (for 8 hours).  … Continue reading

Posted in Current Layout, Layout Construction | 3 Comments

Layout Construction – Mushroom Design

For years, I’ve been procrastinating on the build of my Dream Sn2 SR&RL layout. I’ve been in this house for 13 years….So I’d say I’ve been stalling for more this 8 years. Even as recent as last month I was … Continue reading

Posted in Current Layout, Layout Construction, Layout Design | 2 Comments

3rd Sn2 SR&RL Layout – Tour

My 3rd SR&RL was more grand than the first and the second or first.  It reused the Strong, Philips and connecting trackage from the my first SR&RL.  Phillips was now an operating location trains passed through on their ways to … Continue reading

Posted in Layout #3, Layouts | 2 Comments

2nd Sn2 SR&RL Layout – Tour

The second SR&RL Layout was short lived.  The first layout came down when I got married and moved in with my wife.  The second layout was started after we purchased our first home together.  This layout was only up long … Continue reading

Posted in Layout #2, Layouts | 2 Comments

Dream Layout V2 Concept – More work on grades

I continue to play with my dream Sn2 SR&RL plan as I want to locate Bigelow is a location where I could start building the layout.  By shifting Bigelow under the South end of Strong and moving Carrabasset to the … Continue reading

Posted in Current Layout, Layout Design | Leave a comment